Hotline: 0086-371-67898087    Skype Yahoo MSN
China largest crusher & sand making machine manufacturers TEL:+86-371-67898087

News

Your position: Home > News

Jaw Crusher Installation Instructions

Source: Huahong Machinery By HUAHONGMAC Posted: 2014-4-13 10:04:34

1、jaw crusher is installed by the factory, the user should be checked after the receipt of the jaw crusher machine and eliminate the various problems arising from transport, and then install it.

2、rack installation, the vertical plane at the end of the level of tolerance of 0.5mm / m, the horizontal level degrees (measured on the spindle) Tolerance of 0.15 mm / m.

3、comprehensive inspection before starting the jaw crusher machine. The fastening of the fixed parts, each part of the ubrication as well as V-belt tension level is to check the suitability of the like should be the focus.

4、Check the overall circuit after cuting off jaw crusher switch, and a clear sign hanging switch.


Related Reading